Cincinnati, OH
Mixed-Use High Rise
2016-2019 | Project Architect
Technical Execution:
BIM in Revit
SD through CA Documentation in Revit, Bluebeam & Procore
Renderings and On-Site VR for Coordination in Enscape
2009 | Consultant for ADVA
During the 2008-2009 World Economic Crisis, I worked with Al DeVido and the TTG System Group to reconcile stalled projects using the patented “Top-Down” construction method. The TTG System constructs the top floors just above the ground and then STRAAM jacks are used to lift them up the elevator cores to set them in place with large steel beams.
Technical Execution:
Modeling in SketchUp
Rendering in Kerkythea and GIMP
Tempe, Arizona
2009 | Consultant for ADVA
During the 2008-2009 World Economic Crisis, I worked with Al DeVido and the TTG System Group to reconcile stalled projects using the patented “Top-Down” construction method. The TTG System constructs the top floors just above the ground and then STRAAM jacks are used to lift them up the elevator cores to set them in place with large steel beams.
Technical Execution:
BIM in Revit
Design Modeling in SketchUp
Rendering in Kerkythea and GIMP
Haiti
2011 | Consultant for ADVA
Technical Execution:
BIM in Revit
Design Modeling in SketchUp
Rendering in Kerkythea and GIMP
2009 | Consultant for ADVA
Mixed-Use Residential Tower on Commercial Plinth w/Underground Automated (Robotic) Parking
During the 2008-2009 World Economic Crisis, I worked with Al DeVido and the TTG System Group to reconcile stalled projects using the patented “Top-Down” construction method. The TTG System constructs the top floors just above the ground and then STRAAM jacks are used to lift them up the elevator cores to set them in place with large steel beams.
With the vertical load relying solely on circulation core towers, the floor plans are largely unimpeded by structural columns. This frees up large amounts of space for parking garages. This project envisioned using a system of automated (robotic) parking structures to park and store vehicles for maximum efficiency.
Technical Execution:
BIM in Revit
Design Modeling in SketchUp
Rendering in Kerkythea and GIMP
Bangalore, India
Facade Study for an Office Park
2009 | Consultant for ADVA
During the 2008-2009 World Economic Crisis, I worked with Al DeVido and the TTG System Group to reconcile stalled projects using the patented “Top-Down” construction method. The TTG System constructs the top floors just above the ground and then STRAAM jacks are used to lift them up the elevator cores to set them in place with large steel beams.
Technical Execution:
BIM in Revit
Design Modeling in SketchUp
Rendering in Kerkythea and GIMP